TAP were employed to monitor the CAT A modifications and to design the very specific requirements for Bain & Company to 80,000 sq2 net office space.  The project included the full strip out  then CAT A  installation followed by the CAT B installation for Bain & Company. 

Systems and designs are consistent with London specification and the very specific requirements of the tenant.

New energy efficient systems were installed complete with EC/DC fan coils with matrix control and PI CV and energy management systems such as lighting controls.

Bain & Company brief – leading edge building, reduced energy  footprint, good environmental credentials and sustainability.

40 The Strand Pic 1 2
40 The Strand Pic 3 2
40 The Strand Pic 2 2
previous arrowprevious arrow
next arrownext arrow
40 The Strand Pic 1 2
40 The Strand Pic 3 2
40 The Strand Pic 2 2
previous arrow
next arrow
Shadow

Project Solutions / Achievements

  • Achieved VERY GOOD rating under BREEAM assessment.
  • Low energy 4 pipe EC fan coil system with high efficiency chillers – reduced plant sizes, reduced energy consumption, lower operating costs.
  • High levels of acoustic performance between offices and in meeting rooms required very good design detailing.
  • Extensive use of AV and VC to enable office to office meetings and reduce interoffice travel. 
  • New lighting installation gives good ceiling contrast and improves  internal space greatly.  Extensive use of LED light  sources.
  • Integrated controls systems gives optimum control and perimeter  daylight sensing and absence detection.
  • Full comms room with centralised UPS and external roof mounted standby  generation system.
  • Major catering and staff restaurant facility at 1st floor including a town hall for staff interaction and regular presentations from senior management.
  • Full gymnasium and wellness suite as basement level.