Case Study

kings wharf, reading - the carbon building cat a

A new prominent office building of 27,500 sq ft in the heart of Reading town center, Just a stone’s throw from Reading’s fantastic amenity offering.

Following on from a number of projects recently delivered for Royal London, TAP were delighted to continue our successful relationship with the appointment to carry out the Cat A&B fit-out project at the Carbon Building in Reading. The project involved a comprehensive strip out of all services back to the cores followed by the Cat A fit-out of the four upper levels and a Cat B fit-out of the ground floor. The ground floor was completely redesigned to allow the incorporation of shower/changing facilities as well as the creation of a new entrance and relocation of the existing main reception area to give greater prominence.

004 Carbon Building Kings Wharf Reading2 2
004 Carbon Building Kings Wharf Reading3 2
004 Carbon Building Kings Wharf Reading4 2
previous arrowprevious arrow
next arrownext arrow
004 Carbon Building Kings Wharf Reading2 2
004 Carbon Building Kings Wharf Reading3 2
004 Carbon Building Kings Wharf Reading4 2
previous arrow
next arrow
Shadow

Project Solutions / Achievements

  • Exposed services solution.
  • High efficiency heat recovery VRV system with non-metallic ductwork distribution.
  • New central air handling unit incorporating heat recovery.
  • LED lighting throughout incorporating full lighting control.
  • New power distribution boards throughout.
  • New fire alarm, security and access control systems.
  • New BMS incorporating energy monitoring software.
  • BREEAM ‘Very Good’ Achieved.